Industrial Construction Site
Industrial Construction

Industrial
Waterproofing & Construction.

বাংলাদেশের কমার্শিয়াল ও ইন্ডাস্ট্রিয়াল খাতের বিশ্বস্ত কনস্ট্রাকশন পার্টনার।

Specialized industrial waterproofing, high-capacity floor hardening, and structural retrofitting for commercial and manufacturing facilities across Bangladesh.

Our
Services.

Ensuring 100% structural integrity and leak-free reliability for every project, from commercial basements to heavy industrial zones.

waterproofing
Core Service

Waterproofing & Leakage Treatment

Comprehensive sealing against water intrusion. Includes Concrete Leakage Treatment, Slab Waterproofing, Exposed Waterproof Coating, and Water Repellent work.

repair
Core Engineering

Structural Repair & Anchoring

Restoring structural integrity to damaged concrete through precise Crack Repairing, General Repairing work, and Epoxy Anchoring.

floor
Specialized

Industrial Grouting Systems

High-strength filling and structural stabilization using specialized Non-shrink Grout and Cement Grout Injection pushing work.

coating
Finishing

Surface Treatment & Protection

Enhancing durability and visual finish of concrete surfaces via industrial Floor Hardener application and Fair Face Coating work.

Our Process

How We
Work.

Every structural installation adheres strictly to our rigorous 4-stage turnkey commissioning protocol. We leave absolutely nothing to chance.

01
Phase 01

Site Inspection

Precise structural assessments to identify moisture ingress paths, concrete degradation, and load-bearing faults prior to intervention.

Technical Specifications

  • Thermal Scan
  • Lab Tested Core
  • Micro-Level Mapping
  • Compliance Report
02
Phase 02

Excavation & Cleaning

Mechanically prepare affected concrete, widen cracks, and remove impurities for maximum chemical adhesion.

Technical Specifications

  • 5,000 PSI Wash
  • V-Groove Routing
  • HEPA Dust Extraction
  • Bond-Ready Substrate
03
Phase 03

Epoxy Grouting & Sealing

High-strength epoxy or polyurethane resins pressure-injected deep into the matrix, permanently restoring structural capacity.

Technical Specifications

  • 3,000 PSI Injection
  • Industrial Epoxy
  • < 24 Hour Cure
  • Max Tensile Strength
04
Phase 04

Quality Check

Rigorous watertightness testing and load capacity verification to ensure our 100% leak-free guarantee is met.

Technical Specifications

  • 48-Hour Submerge
  • Adhesion Pull Test
  • Zero Seepage Visually
  • Full Certification

Industrial
Coverage.

We deploy specialized structural engineering teams across high-demand sectors in Bangladesh, ensuring zero downtime for critical facilities.

Heavy Manufacturing

High-Load Floor Hardening | Chemical Resistant Coating
40%

Commercial Healthcare

Hygienic Epoxy Floors | Sterile Grouting
25%

Commercial Real Estate

Basement Waterproofing | Slab Leakage Treatment
20%

Industrial Warehousing

Heavy Duty Retrofitting | Abrasion Resistant Flooring
15%

Nationwide Dispatch

HQ: Mirpur DOHS, Pollobi

LAT: 23.8341° N
LNG: 90.3857° E
Systems Active

400+

Projects Commissioned

Since inception

100%

Leak-Free Guarantee

Zero tolerance

50+

Industrial Partners

Ongoing contracts

24h

Emergency SLA

Diagnostic dispatch

Client Verification

Trusted by Industrial
Leaders.

Our engineering protocols have been battle-tested in Bangladesh's most demanding manufacturing environments.

এজেড এন্টারপ্রাইজ মাত্র ৭২ ঘণ্টার মধ্যে আমাদের ম্যানুফ্যাকচারিং প্ল্যান্টের বেসমেন্ট ওয়াটারপ্রুফিংয়ের কাজ সম্পন্ন করেছে। ভারী বর্ষণ ও হাইড্রোলিক প্রেসারের মধ্যেও তাদের স্ট্রাকচারাল সিলিং সম্পূর্ণ নিখুঁতভাবে কাজ করছে।

Eng. Shahin Miah

Plant Manager, Textile Manufacturing

Gazipur Industrial Belt

তাদের ইপোক্সি ইনজেকশন পদ্ধতির কারণে আমাদের লজিস্টিকস ওয়্যারহাউসের একটি ক্রিটিক্যাল লোড-বিয়ারিং স্ল্যাব স্থায়ীভাবে স্ট্যাবিলাইজ করা সম্ভব হয়েছে। তাদের টিম অত্যন্ত সুশৃঙ্খল, সেফটি স্ট্যান্ডার্ড মেনে কাজ করে এবং কাজের ক্ষেত্রে খুবই নির্ভুল।

Tareq Rahman

Director of Operations

National Logistics Park

৫০,০০০ স্কয়ার ফিট ফ্লোর হার্ডেনিংয়ের জন্য আমরা তাদের চুক্তিবদ্ধ করেছিলাম। কাজের দুর্দান্ত অ্যাব্রেশন রেজিস্ট্যান্সের কারণে আমাদের ধুলোর সমস্যা পুরোপুরি দূর হয়েছে এবং ফর্কলিফট অপারেশন আগের চেয়ে অনেক সহজ হয়েছে।

Kamal Hossain

Chief Engineer

Pharmaceuticals Complex

Contact Our Team

Ready to
Start?

Contact our team for a free site inspection, technical proposals, and emergency leakage treatment.

আপনার প্রজেক্টের ব্যাপারে বিস্তারিত কথা বলতে আমাদের বিশেষজ্ঞ টিমের সাথে যোগাযোগ করুন।
হোয়াটসঅ্যাপে মেসেজ দিন